Guides

Plan the move before anything moves.

Practical maps for planning a cloud migration and running what lands, written by the Optidata engineers who do this for a living. Each guide is free: one short form on its page and the PDF is yours.

The library

Start with the map that matches your move.

Two guides today: one for ERP estates, one for full on-premise environments. New material lands here as the engineering team publishes it.

Strategic map · PDF

ERP Cloud Migration Strategic Map

The critical decisions of an ERP move, phase by phase: what to settle before anything moves, what to validate while it happens, and what secures the result after go-live. Built to avoid rework, risk, and operational impact.

  • How to plan: goals, requirements, feasibility, and risks.
  • How to execute with control: tests, validations, backup, and data integrity.
  • How to ensure post-migration results: training, support, and optimization.
Get the map

Free, delivered as a PDF. The material is in Portuguese (Brazil).

Infographic · PDF

On-Premise to Cloud Migration Map

The whole journey from a server room to the cloud, condensed onto a single page: what to plan before you move, how to right-size what you are moving, and how to keep the operation safe while it happens.

  • Migration planning: steps, priorities, and the critical points where projects usually slip.
  • Right-sizing: how to think about CPU, memory, disk, and capacity before you commit.
  • Security and continuity: best practices to reduce exposure and downtime while everything moves.
Get the map

Free, delivered as a PDF. The material is in Portuguese (Brazil).

Next steps

When the map is not enough.

The guides get you to a plan. These two places get you past it: what our engineers write in the open, and the team that runs the move for you.

The Optidata blog

Articles on cloud, infrastructure, security, and operations, published in the open. No form between you and the text.

Read the blog

Cloud Migration, run for you

When the plan is ready and you want engineers to execute it: assessment, migration plan, cutover inside an approved window, and assisted operation after go-live.

See the migration service